As you can see from the list of works below we are now being regarded as a sub-consultant and we endeavour to work closely with our client’s to achieve a highly accurate record for their design requirements. We now provide a more detailed resume on our current services.
|
 |
Study of drainage systems, refuse chutes and roof drains on various multi storey buildings within Aberdeen on the instruction of Aberdeen City Council. |
 |
Study of culverts and drainage systems airside and land side for BAA (Aberdeen Airport). Further works in 2011 have recently been authorised by the airport to continue the conditional survey of culverts airside which are undertaken at night to avoid disruption to the facility. |
 |
Study of East Tullos Burn leading from Wellington Road through the industrial estate of East Tullos to the outfall, a distance of approximately 3000m. This was a project instigated by SEPA to investigate pollution incidents within the East Tullos Industrial Estate. Other private industrial sites in this area were also investigated by Drainflow at this time. |
 |
Complete drain study of potential site for bus station. |
 |
Complete study of the new drainage system at the prestigious Union Square shopping development in Aberdeen. Drainflow had previously been employed by Hammerson the developers via Fairhurst prior to works commencing to investigate and map out the existing systems leading from the railway & bus stations for design purposes. |
 |
Complete topographical survey, pre clean, map out and inspection of the drainage systems at Vetco UK sites in Aberdeen and Montrose. |
 |
Complete drainage study of various sites at Aberdeen Royal Infirmary prior to construction work starting. |
 |
Complete study of 23 distilleries throughout Scotland to map out and inspect complete sites to comply with EU legislation. This led us to working throughout Scotland over a period of four years. |
|
|
|
|
|
|
|