| Drainflow have recently completed the pre clean, and cctv survey of the complete drainage system at the Turriff slaughter house and meat preparation facility owned and operated by Morrisons. Work was carried out on Saturdays over a six month period as work could not take place during site opening times, due to heavy water flows and included updating the existing AutoCad drainage drawing. This was a SEPA requirement and required tenacity and patience of our work force as the work was arduous and complicated. Two previous contractors employed had not been able to complete certain areas of the site due to these on going conditions which were overcome by Drainflow. Contract value £11,000 delivered on budget. |